What i understand on Organization in the GDC (P) Plant 1
Organization in the GDC (P) Plant 1
No |
Department |
Roles |
1 |
Operation |
Operating all the equipment in the plant in 24-hour basis |
2 |
Maintenance |
Managing the service and maintenance works in the plant |
3 |
Administration |
Fulfill administrative requirement of the plant |
4 |
HSSE |
Responsible to health, safety, security and environmental |
Table 2.02: Department and its own roles in the plant.
Since it is the most important department, this department must exist in the plant on 24 hours basis. This department work on 12 hours, 2 shift rotation and every shift consist of a shift supervisor, a boiler operator, a panel operator and three field operators. Every personnel have their own set of skills and responsibility and ever activity is under direct supervision of leader in the shift (shift supervisor).
Operation department activity.
Operation department role is quite important
to the plant. Since the plant is running on 24- hour basis, most of the
activities in the plant coordinated, controlled and approved by the operation
department itself. It also must be the first line to predict, troubleshoot and
make sure every equipment working accordingly to process and instrument flows.
Most of the equipment operating in semi – automatic mode that required technical personnel presence at site. Instead of Direct Control System (DCS) installed in every equipment that usually make it unmanned control, this semi – automatic control happened due to old plant status with old equipment and component such as manual valves and eyes monitoring temperature thermometer and gauge, and parameter defect from the malfunction sensors and transmitter.
Semi – automatic
mode is really requiring expertise and experienced site-based personnel.
Without yearly experienced, no one will know where to go and how to operate
equipment. Field operator must record temperature reading every hour for every
equipment. Same goes to boiler driver, they must record natural gas consumption
and steam generation to the header hourly for every boilers and heat recovery.
Unit start and stop sequence also require their presence especially to manually
filling basin in cooling tower and to start the pump.
Photo 2.2 Boiler
installed in the plant
|
Photo 2.3: Discussion at the
workstation |